DAS Management Service Independent Testing

Pre & Post Fit-Out Works DAS Testing

Independent DAS performance testing and antenna management before, during and after commercial fit-out works. Protect the building, the tenants and the contractors with documented proof of due diligence.

RF Walktest + PIM Test Independent before and after reports ARCIA and ACMA accredited
3 Visits
Survey, pre-works and post-works, each documented
2 Reports
Independent before and after performance baselines
All Carriers
Telstra, Optus and Vodafone mapped floor by floor
From $504 Survey
Fixed-price site survey and briefing
The Risk of Not Testing

A Fit-Out Doesn't Have to Damage a DAS to Cause a Problem

Ceiling works, new partitions, relocated services and construction materials all change how RF signals move through a building. A fit-out can affect DAS performance across the whole building, not only the floors where the work is happening. Without a performance snapshot taken before works begin, there is no way to prove what caused a coverage issue, or who is accountable for fixing it.

Whole-Building Coverage Risk

DAS infrastructure serves every floor. Poor DAS management during a fit-out can degrade mobile coverage for every tenant, not just those directly affected by the works.

Unclear Liability

Without pre-works documentation, proving whether a coverage problem existed before the fit-out or was caused by it is nearly impossible after the fact.

Carrier Repair Costs

If a mobile carrier suspects its infrastructure has been damaged, investigation and repair costs land on whoever is responsible for the building works, with no evidence to push back.

No Evidence of Due Diligence

FMs, contractors and tenants all carry exposure without documented proof that proper DAS management procedures were followed throughout the works.

That is the exposure a Pre & Post Fit-Out program removes. A documented DAS baseline before works start, and a matching report after reinstatement, so every party is covered.

The Process

Three Visits. Full Protection.

Our Pre & Post Fit-Out Works service is structured around three clearly defined visits, each with a specific purpose and a documented outcome for every party involved.

01 Visit One

Site Survey & Briefing

We attend site as early as possible in the project planning process, alongside the fit-out contractor. We walk the space, review the DAS layout, identify which antennas are at risk, and document the existing infrastructure before any planning is locked in.

  • On-site walkthrough with the fit-out contractor
  • DAS antenna identification and risk assessment
  • Scope of works agreed before testing commences
  • Fixed-price survey, regardless of building size
02 Visit Two

Pre-Work Testing & Make Safe

Before a single ceiling tile is touched, our RF engineers run a full RF Walktest and PIM Test on the DAS sectors serving the works area. Antennas within the works zone are professionally removed and made safe. You receive a detailed performance report, your documented baseline.

  • RF Walktest, floor-by-floor signal mapping across all major carriers
  • PIM Test, interference check on the affected DAS sectors
  • Physical antenna removal and make-safe by qualified technicians
  • Written report documenting the pre-works DAS baseline
03 Visit Three

Reinstatement & Post-Work Testing

Once the fit-out is complete, we return to reinstall every antenna in its original position and repeat the full RF Walktest and PIM Test. The resulting report confirms whether the works have had any measurable impact on DAS performance across the building.

  • Antenna reinstatement to original positions
  • Full repeat of the RF Walktest and PIM Test
  • Written post-works performance report
  • Before and after comparison available on request
What You Receive

Two Independent Reports. Clear Evidence.

Your documented proof of due diligence, from the first site survey through to post-works sign-off.

Pre-Works Performance Report

A full baseline of DAS signal strength, data throughput and voice quality across all major carriers, captured before any works commence.

Post-Works Performance Report

The same testing repeated after reinstatement, confirming whether the fit-out has had any measurable impact on building mobile coverage.

Protection Against Carrier Claims

If a mobile carrier raises concerns about DAS infrastructure following the works, your reports provide clear, independent evidence of the building's condition before and after.

Shared Protection for All Stakeholders

The FM, the contractor and the tenant each benefit from the same documentation. If a coverage issue arises down the track, the reports show that all parties completed their due diligence.

Transparent Pricing

Build Your Fit-Out Testing Estimate

Pick your state, building size, DAS sectors and antenna count to estimate the full three-visit program. RF Walktest, PIM testing and antenna works are each charged once per project and split evenly across the two testing visits. All prices are ex GST and include project management, written reporting and standard mobilisation.

01

Project State (Visit 1 Survey)

Visit 1 is a fixed-price survey and briefing. In-person walkthrough for NSW and QLD, desktop survey for all other states. Testing prices below update to your state.

02

RF Walktest (per project)

Charged once per project and split across the two testing visits. Includes project management, reporting and standard mobilisation. Floor-by-floor mapping across Telstra, Optus and TPG.

03

PIM Testing (per project)

Charged once per project and split across the two testing visits. Interference check on the DAS sectors serving the works area, report included.

04

Antenna Count (per project)

Covers both removal at Visit 2 and reinstatement at Visit 3, charged once per project and split across the two visits. Antenna works are completed alongside the walktesting.

Your Estimate

NSW · Up to 8 floors · Up to 3 sectors · Up to 8 antennas

Total Program Estimate
$ 5,294.40
Across all three visits, ex GST
Visit 1 · Survey & Briefing $420
Visit 2 · Pre-Work + Removal $2,437.20
Visit 3 · Post-Work + Reinstall $2,437.20
Every price includes project management, written reporting and standard mobilisation. The far larger cost is an undocumented carrier dispute after the works are done.

Estimate only, confirmed on quote. Testing and antenna charges are per project, shared evenly across Visits 2 and 3. Pricing assumes business hours with a maximum of 8 hours on site and standard mobilisation; variations apply if exceeded. Flights, car hire and equipment baggage for interstate jobs are all additional charges to the current quote.

Who It's For

Protecting Every Party Involved

This service is relevant to anyone responsible for a commercial space where DAS infrastructure exists and fit-out works are planned or under way.

Facility Managers

Protect the building's DAS infrastructure and demonstrate due diligence to building owners and mobile carriers.

Fit-Out Contractors

Independent documentation confirming DAS performance before works began, your protection against post-project coverage claims.

Tenants

Entering a new space or completing a make-good? Make sure any pre-existing DAS issues are documented before you are held responsible.

Project Managers

Build DAS management into your standard fit-out scope and handover checklist to minimise risk for your clients and your firm.

Ready to Protect Your Next Fit-Out?

Get in touch to discuss your project. The earlier we are involved, the better, the pre-works visit needs to happen before any ceiling work begins. Speak to a Digicom RF specialist about a Pre & Post Fit-Out program for your building.